By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
News as they happen
  • News
  • Canada
  • Business
  • Politics
  • Science
  • World News
  • Isness
Reading: Meta to Build $13 Billion Alberta Data Center, Its First in Canada
Sign In
Font ResizerAa
News as they happenNews as they happen
  • News
  • Canada
  • Business
  • Politics
  • Science
  • World News
  • Isness
  • News
  • Canada
  • Business
  • Politics
  • Science
  • World News
  • Isness
Have an existing account? Sign In
© Foxiz News Network. Ruby Design Company. All Rights Reserved.
meta-to-build-$13-billion-alberta-data-center,-its-first-in-canada
Meta to Build $13 Billion Alberta Data Center, Its First in Canada

Meta to Build $13 Billion Alberta Data Center, Its First in Canada

Last updated: July 9, 2026 4:48 pm
By Reuters
3 Min Read
Share
SHARE
Meta to Build $13 Billion Alberta Data Center, Its First in Canada

The logo of Meta at the Meta Lab in Los Angeles, California, U.S., May 20, 2026. Reuters/Daniel Cole/File Photo

CALGARY, July 8—Tech giant Meta announced Wednesday it will build a massive data center in central Alberta, the company’s first in Canada, as it rapidly builds out computing capacity to support the global AI boom.

The 1-gigawatt data center will be located in Sturgeon County and represents a total investment of C$13 billion, or $9.17 billion, Meta said.

Meta has doubled down on AI, pledging hundreds of billions of dollars to build large AI data centers in the U.S. The Alberta announcement represents the company’s 33rd data center globally.

Executives made the announcement in Calgary alongside Premier Danielle Smith and other Alberta government officials, who have spent several years courting Silicon Valley tech giants with the aim of spurring a large-scale investment in the oil-and-gas province.

Meta, like other tech giants, is facing rapidly expanding power needs due to the growth of AI, and Alberta is rich in natural gas which sells at a significant discount to the U.S. benchmark.

The province’s cold climate also makes cooling the massive super-computers and related data center infrastructure more cost-efficient.

The 20 existing small- to mid-scale data centers in Alberta already pull from the province’s energy grid, which is 60 percent powered by natural gas. The provincial government is giving ​new proponents the option to build their own power sources to avoid limits on power capacity.

Meta said Wednesday it will fully fund new generation and grid infrastructure for its Alberta data center, which will consume about as much electricity as 800,000 homes.

The company has partnered with Alberta-based Pembina Pipeline, which announced last week it will go ahead with its Greenlight Electricity Centre, a new natural gas-fired power-generation facility in Sturgeon County which will be in service in late 2030 and with which Meta has a long-term tolling agreement.

The project will require approximately 150 million cubic feet per day of natural gas, according to Pembina, helping to create demand for Western Canadian natural gas producers.

Canada’s government laid out an AI strategy last month that suggested new data center growth would benefit from the country’s clean electricity grid, which is largely powered by renewables and low-emission power sources.

But the vast majority of data centers currently in the planning stages in Canada are located in Alberta, where a reliance on natural gas means the emissions intensity of the province’s electricity grid is almost five times the national average.

67% of Canadians Prefer ‘Merry Christmas’ as Go‑To Holiday Greeting
Number of Homeless Veterans in Canada Decreasing: Federal Memo
What to Know About the Drug Causing a Withdrawal Crisis in Fentanyl Users
AI Boom Is Driving a Global Memory Chip Shortage
Huge Sterile Fly Facility Opens in Mexico to Counter New World Screwworm
TAGGED:CanadaWorld News
Share This Article
Facebook Email Copy Link Print
Subscribe to Our Newsletter
Subscribe to our newsletter to get our newest articles instantly!

    5 + 6 =

    You Might Also Like

    cvs-caremark-reaches-settlement-with-ftc-in-insulin-pricing-case
    BusinessCompaniesUncategorized

    CVS Caremark Reaches Settlement With FTC in Insulin Pricing Case

    By Bill Pan
    1 Min Read
    why-your-brain-overreacts-to-fear—and-how-to-fix-it
    ScienceScience NewsUncategorized

    Why Your Brain Overreacts to Fear—and How to Fix It

    By Debbie Cohen
    1 Min Read
    algoma-steel-getting-$500m-in-government-loans-to-shift-production-from-us
    CanadaFeatured Canadian NewsUncategorizedWorld News

    Algoma Steel Getting $500M in Government Loans to Shift Production From US

    By The Canadian Press
    1 Min Read
    News as they happen

    We influence thousands of users and are the number one business and technology news network on the planet. Newsguard delivers everything you need to know to live your best life, best tech trend, traveling passion and more…

    Categories

    • The Escapist
    • Entertainment
    • Bussiness

    Quick Links

    • Advertise with us
    • Newsletters
    • Complaint
    • Deal

    @Newsguard – Codeus Design. All Rights Reserved.

    Welcome Back!

    Sign in to your account

    Username or Email Address
    Password

    Lost your password?